PROJECT: Luxor International Airport
2001-2005
Luxor International Airport was upgraded in 2005 to accommodate up to 8 million passengers per annum in recognition of the increasing tourist market in the region. The terminal now operates 48 check-in desks, 8 boarding gates and 5 baggage reclaim belts.
In developing the airport the following services required upgrading:
- Airport power station and airport-wide electrical supply
- Telecommunications
- Foul water system
- Fire fighting systems
- Pumping stations
- Underground reservoir
- Air conditioning systems
Providing extensive engineering design and site supervision services throughout the Luxor Airport Development project the following services were provided:
- Electrical engineering
- Mechanical engineering
- Drainage expertise
- Architectural services
- Soil investigation surveys